Kad smo vec kod smaka sveta...:D
So, baby, fasten your seat-belts and enjoy the ride...the devil is about to start marching again... :D
All repairs in Sector 3-4, the sector damaged during the incident last September, have been completed and the sector has been closed up. After the last electrical interconnection was brazed, the final ‘W bellow’ - the large accordion-shaped sleeve that covers the interconnections between two magnets - was closed on 23 June. The teams have now started to pump the air out in order to leak-test the insulation vacuum. Once all the vacuum tests and electrical tests have been completed the sector will be ready to start the cool-down process.